Skip to content Skip to footer

Wastewater Pumping Stations & Force Mains Evaluation, Design, and Development (RFP Preparation & Contract Documentation)

This project involves comprehensive studies, design works, development activities, and preparation of Request for Proposal (RFP) documentation, along with the evaluation of wastewater pumping stations and main force sewer pipelines. The scope also includes upgrading and redesigning existing infrastructure as well as planning new systems to improve the overall wastewater network efficiency.

Client / OwnerHousing and Utilities Projects Execution AuthorityProject LocationJanzour Municipality – Jafara Plain – Tripoli, LibyaContract YearNovember 2026Project Duration18 MonthsProject AreaAll works are conducted within Janzour Municipality – Jafara Plain – Tripoli and surrounding service zones as defined by the project scope.Share

Scope of Work

  • Study, assessment, and upgrading of existing pumping stations
  • Design of main and secondary wastewater pumping stations
  • Evaluation of existing force main pipelines
  • Design of new and proposed force main pipelines
  • Comprehensive engineering studies for the wastewater collection network
  • Preparation of full technical documentation and RFP packages
  • Infrastructure analysis and optimization within the project area

Al-Saed Shareholding Company for Engineering Works

Libya – Benghazi

Venice District – Venice Street
Next to Benghazi Security Directorate

Libya – Tripoli

Garji Area – Al-Dhaman Intersection

Egypt – Alexandria

Moharam Bek – 70 Mansheya Street

Phone Numbers

+218 913 806 732
+218 918 229 000
+218 918 060 222
+20 100 000 3192

El-Saed © 2026. All rights reserved.